Design

Designed by world-renownded acoustician Sam Toyoshima

image15

and project-managed by expertise Team 108, the 2,700 sq ft studio was over one year in the making with careful eye on design, craftsmanship and finishing details.

Recce the site

image16

Toyoshima san taking a visit to the studio while it was still under construction.

Overlooking the construction

image17

From Left, Gao Yang. Middle, Team 108 -  Kevin Nair. Right, studio acoustic designer - Sam Toyoshima.

image18

Doing a check on the control room

lead by Kevin Nair and Gun san

image19

Expert advisors

carefully guided the project from start to completion